Clothing OEM factory inspections must simultaneously verify the operating entities, actual production relationships, target category processes, quality systems, scheduling and project data management. Seeing a workshop is just a starting point, but it doesn’t mean it will be suitable for your order.
Do desktop verification before factory inspection
You can eliminate some risks without going to the scene:
- inNational Enterprise Credit Information Publicity SystemQuery the registration status of the contract subject.
- Check the subject relationships corresponding to the official website, contract, invoice and collection account.
- It is required to provide samples, process descriptions and factory visits related to the target category.
- Send the quantity, fabric, process and delivery date to the other party and observe whether they raise specific questions.
- Desensitization is acceptable for customer information that cannot be disclosed, but the ability description cannot be replaced by the logo of a well-known brand.
How to avoid watching only promotional videos when watching videos
To reserve real-time video, it is recommended to start from the door, floor or address logo, and try to view it continuously:
- Fabrics and trims receiving and warehousing;
- pattern making, sampling and cutting;
- Sewing flow and key equipment;
- Printing, embroidery or other craft areas;
- Ironing, quality inspection, packaging and finished product warehouse;
- Production kanban or progress record after desensitization on the day.
If part of the process is outsourced, it is required to explain what the outsourced unit is responsible for, how transportation is arranged, and who is responsible for quality inspection and rework. It is common for professional outsourcing to exist in the clothing supply chain. The key is information transparency and clear responsibilities.
On-site factory inspection list
| area | Observation content | Questions to ask |
|---|---|---|
| Sample/print room | Pattern, version, sample modification record | Who confirmed the final version? How to prevent mistaking documents? |
| Crop | Loose cloth, layout, number of layers, number | How to subcontract and manage color differences and different sizes? |
| Sewing | Process allocation, semi-finished product circulation, equipment adaptation | Where are the difficult processes of the target style? |
| printing and embroidery | sample development, color, position and attachment effects | Are process samples made before bulk production? |
| Quality inspection | First article, patrol inspection, final inspection or random inspection records | How to classify defects and how to close the loop of rework? |
| Warehousing | Fabrics and trims identification, finished product isolation, packaging | How to avoid mixing of different orders and batches? |
| Project management | Schedule, exception record, contact person | When will the purchaser be notified of delays or material changes? |
Production capacity cannot be just listened to a number
Daily production capacity and annual production capacity must be understood in conjunction with categories, processes, production lines, shifts and current schedules. The production efficiencies of T-shirts, outdoor jackets and complex workwear are not directly interchangeable. A more useful question than "How many pieces are produced per day?" is:
- How many production lines are currently the same or similar to your project?
- After the fabrics are available and the samples are confirmed, when can it be put online at the earliest?
- Which process may become the bottleneck?
- How to deal with orders or personnel changes during the peak season?
- To what extent will the progress deviate from the plan? Will a proactive warning be given?
The quality system must be implemented in order documents
The purchaser should see how final samples, size sheets, tech packs, fabrics and trims confirmations, inspection records and packing lists flow through an order. Certificates or promotional slogans on the wall are no substitute for order-level quality control. The qualification certificate also needs to check the subject, scope of application and validity period of the certificate.
How to judge "source factory"
"Source factory" is not a unified certification term. A more reliable way to ask is: which processes are completed by the contracting entity or related production units, which ones are outsourced, and what responsibilities the factory bears for the final quality. As long as the supplier clearly explains the production relationship, costs and responsibilities, the purchaser can make a true judgment.
Contact Jijing Manufacturing to visit the factory and sample development
Jijing Manufacturing is located in Shishi, Quanzhou, and can communicate with video factory or on-site visits around workwear, teamwear, functional clothing and OEM/ODM projects. Indicate the target category, style, quantity and delivery date in advance so that we can discuss the process, sample development and production arrangements together.